Orlando's EV Charger Installation Experts — Free site survey & load calculation on every quote

What to Expect: EV Charger Installation in Orlando

From the first call to the first charge — the four steps, what happens on install day, and what you need to do (very little).

What to expect from EV charger installation in Orlando? If you have never had electrical work done, the process can feel opaque: who comes, what they do, how long it takes, and what you need to prepare. This guide walks through the whole thing — the 4-step process from the first call to the first charge — so there are no surprises. The short version: you call and describe your setup, we visit and run a load calculation, we install on a permitted visit, and we inspect, test and walk you through it. Most homeowners charge the same night.

The process is the same for a Tesla Wall Connector, a ChargePoint Home Flex, a NEMA 14-50 outlet or any other Level 2 install, and it is the same across Orange, Seminole and Osceola counties. The details — the permit office, the timeline, the wire route — vary by address, but the steps do not.

Step 1: Call and describe your setup

The process starts with a call or a quote request. Tell us your car — make, model and year — your home and where you park, and anything you know about your panel. You do not need to know the technical details: “I have a Tesla Model 3, I park in the garage, the panel is in the garage too” is a perfect start. We will ask about your driving — how many miles a day — because that decides the amperage, and about your utility, because that decides which rebate programs to check. Call (407) 555-0134 (placeholder) or use the quote form on our contact page.

This first conversation is also where we set expectations: a typical Level 2 home install in Orlando runs $800–$2,500 including the charger, with simple short-run jobs from around $599, and panel work adds roughly $2,000–$5,000 when a load calculation requires it. We will not quote a firm price over the phone, because the price depends on your panel, your wire run and your charger — and anyone who does quote firmly without seeing the house is guessing. What we will do is book the survey.

Step 2: On-site assessment and load calculation

The survey is a visit to your home, and it is free. We inspect your panel — its size, its condition, whether there is space for a new breaker — measure the wire run from the panel to the charger location, look at the parking and the mounting surface, and run a load calculation under NEC Article 220. The load calculation is the technical heart of the job: it shows whether your panel can carry a 50A or 60A breaker, whether a lower-amperage install or a load management device is needed, or whether a panel upgrade is genuinely required. It is also part of the permit application.

At the survey we also confirm the charger — Tesla Wall Connector, ChargePoint Home Flex, Wallbox, Emporia or Grizzl-E — the connector, the install style, and the placement. We walk the wire route with you, point out where the wire will run, and answer the questions that only make sense standing in your garage. After the survey you get a written, all-inclusive quote: labour, materials, permit and inspection in one figure. That is the number to compare, not a verbal estimate.

Step 3: Permitted install — usually one visit

Once you accept the quote, we file the permit with the city or county that covers your address, and schedule the install once the permit is approved. The install itself is usually a single visit of a few hours for a standard Level 2 job. On install day, the power is off briefly while the new circuit is connected, the wire is run from the panel to the charger location, the breaker is installed, the charger is mounted and wired, and the app is set up with your charging schedule. Panel upgrades, long runs and trenching take longer, and we will have told you that at the survey.

What do you need to do on install day? Very little. Clear access to the panel and the charger location, keep pets and children away from the work area, and be available for the walkthrough at the end. You do not need to take the whole day off — the install is a few hours, and we will give you a time window. The permit and the inspection are handled by us: we file, we schedule, and we meet the inspector.

Step 4: Inspection, testing and walkthrough

After the install, the work is inspected. The inspector checks the breaker and wire size, the routing and protection, the GFCI where required, the mounting and the earthing, and that the load calculation supports the new circuit. We schedule the inspection and meet the inspector, so you do not need to be there — though you are welcome to be. If the inspector finds something, we fix it and call for a re-inspection. A passed inspection is the independent confirmation that the work is safe and to code.

Then comes the testing and the walkthrough. We test the charger under load — a real charge, not just a power-on — and we walk you through it: how to plug in, how to read the lights, how to set the schedule in the app, how to set the charge limit in the car, and what to do if anything looks wrong. Most homeowners charge the same night, and the first charge is the moment the whole process makes sense: you plug in, you walk away, and the car is full in the morning. Our Orlando permit guide covers the permit and inspection in more detail.

After the install: the first month

The first month is about building the habit and confirming everything works. Plug in every night, set the charge limit to 80% for daily driving, and check the app weekly to confirm the schedule is working. If anything feels wrong — the charger trips, the app will not connect, the car charges slowly — call us rather than waiting. A new install that is not working properly should be checked under the workmanship guarantee, and most teething problems are a setting or a Wi-Fi issue. Our beginners guide covers the first month in detail, and our Wi-Fi troubleshooting guide covers the most common app issue.

And keep the paperwork: the permit, the inspection record, the invoice and the charger's make, model and serial number. That file is what utility rebate programs ask for, what a future buyer will want to see, and what proves the work was permitted and inspected. It is a small file that matters more than most homeowners expect.

Questions Homeowners Ask Us

What happens during an EV charger installation?

Four steps: call and describe your setup; on-site assessment with a load calculation; the permitted install, usually one visit; then inspection, testing and a walkthrough. Most homeowners charge the same night.

How long does EV charger installation take in Orlando?

The install itself is usually a single visit of a few hours once the permit is approved. The full timeline from survey to signed-off install is usually measured in weeks, depending on your city's permit timeline.

What does the inspection check?

The inspector checks breaker and wire size, wire routing and protection, GFCI where required, charger mounting and earthing, and that the load calculation supports the new circuit.

Do I need to be home for the installation?

You need to be available for the walkthrough at the end, and to give access to the panel and the charger location. We handle the permit and meet the inspector, so you do not need to take the whole day off.

Ready to Get Your Charger Installed?

Every quote starts with a free on-site assessment and load calculation. Call (407) 555-0134 (placeholder) or visit our contact page to book your survey.

Related services: Level 2 EV charger installation, Residential EV charger installation, Tesla Wall Connector installation.

Related guides: EV charger permit guide for Orlando, EV charger installation cost factors, First EV home charging beginners guide.

Service areas: Winter Park, Lake Nona — and all areas on our service areas page. Back to the EV charger guides hub.

☎ Call (407) 555-0134Get a Free Quote