Level 2 EV Charger Installation in Orlando
Our most-booked service — and the one that changes daily life the most. Level 2 EV charger installation gives you 25–44 miles of range per hour on a 240V circuit, so your car recharges fully overnight while you sleep. Call (407) 555-0134 (placeholder).

Level 1 charging on a standard 120V outlet gives 3–5 miles per hour and takes 24–48+ hours for a full charge — fine for an occasional top-up, frustrating as a daily routine. Level 2 on 240V delivers 25–44 miles per hour and a full charge in 4–10 hours. Level 3 DC fast charging is faster still, but it is a commercial product, not a home charger.
We install Level 2 chargers from Tesla, ChargePoint, Wallbox, Emporia, Grizzl-E, Ford and Rivian, hardwired or plug-in, on 40A, 48A and 60A circuits. Every job starts with an on-site assessment and a load calculation — the breaker and wire are sized to the charger and to your panel, never guessed. A 48A charger needs a 60A breaker and 6 AWG copper wire, a 40A charger needs a 50A breaker, and a 32A charger needs a 40A breaker, under the NEC 80% continuous-load rule.
How It Works
How Level 2 EV Charger Installation Works
The process is simple: site survey and load calculation first, then the permit and charger choice, then the permitted install — usually one visit — and finally inspection, testing and a walkthrough before we leave.
Older Orlando homes often run on 100-amp panels, and a 100-amp panel does not automatically mean a panel upgrade. A lower-amperage charger, a load-management device or a sub-panel can solve it — the load calculation tells us which. If an upgrade is genuinely needed, we handle that too; see our electrical panel upgrade for EV chargers page. And if you drive a Tesla, our dedicated Tesla Wall Connector installation page covers the Gen 3 unit in detail.
How Much Does a Level 2 EV Charger Installation Cost?
A typical Level 2 home install in Orlando runs $800–$2,500 including the charger. Simple short-run jobs start from around $599, and panel work adds roughly $2,000–$5,000 when a load calculation requires it. Distance from the panel, panel capacity, wall construction and charger choice are what move the price. See our EV charger installation cost factors guide, and for the breaker and wire rules, our EV charger breaker and wire size guide explains the 48 amp EV charger wire size in full.
Why Homeowners Pick Us
Licensed & Insured Florida Electricians
Level 2 installs by licensed electricians who size breakers and wire to code every day.
Permits & Inspection Handled
We pull the permit and book the inspection on every new 240V circuit, so the work is signed off and documented.
Load Calculation First
We calculate what your panel can carry before recommending a charger size, a load-management device or an upgrade.
Honest, Survey-Based Quotes
Every quote starts with a free site survey — a real figure for your home, not a flat price.
Orlando EV Installers — serving Orlando & Central Florida, Orange, Seminole & Osceola counties. Call (407) 555-0134 (placeholder).
Trust Signals
Licensed, Permitted & Inspected — Every Time
Every Level 2 install is carried out by licensed and insured Florida electricians, with permit, inspection and a load calculation before every install, and our workmanship guaranteed in general terms. We serve Orlando and Central Florida — Orange, Seminole and Osceola counties — including Winter Springs, Kissimmee and Altamonte Springs. See the full list on our service areas page.
New to home charging? Start with our first EV home charging beginners guide and our Level 1 vs Level 2 vs Level 3 charging guide, then book the free survey. Related services: residential EV charger installation, Tesla Wall Connector installation and NEMA 14-50 outlet installation. Back to the services hub or the home page.
Questions Homeowners Ask Us
How much does it cost to install a Level 2 EV charger?
A typical Level 2 home install in Orlando runs $800–$2,500 including the charger. Simple short-run jobs start from around $599, and panel work adds roughly $2,000–$5,000 when a load calculation requires it. Every quote starts with a free site survey.
How many amps does an EV charger need?
It depends on the charger. Common pairings under the NEC 80% continuous-load rule: a 32A charger needs a 40A breaker, a 40A charger needs a 50A breaker, and a 48A charger needs a 60A breaker and must be hardwired.
What size breaker for a Level 2 charger?
Size the breaker at 125% of the charger draw: 32A charger → 40A breaker, 40A charger → 50A breaker, 48A charger → 60A breaker with 6 AWG copper wire. A 48A charger cannot run on a 50A receptacle.
Can I install a Level 2 charger on a 100-amp panel?
Often yes, if the load calculation allows it. Options when capacity is tight include a lower-amperage charger, a load-management device, a sub-panel, or a panel upgrade as a last resort. We run the calculation first and recommend the cheapest safe option.
How long does EV charger installation take?
A standard residential Level 2 install is usually a single visit of a few hours once the permit is approved. The on-site assessment and load calculation come first, then the install, inspection, testing and walkthrough.
Finding a Level 2 Installer Near You
Looking for a Level 2 EV charger installer in Orlando, or an electrician for EV Level 2 charger installation? That is this page's job — a dedicated 240V circuit, sized by load calculation. Level 2 charger installation in Florida follows the same process as Level 2 charger installation in Orlando — permit, circuit, charger, inspection — with Orlando's older homes adding the panel question. People searching for level 2 charger installation near me or level 2 charger installation cost will find both on this page and in our cost guide.